Our Experience

  • Risk Based Inspection of stationery equipment at Sui Field Location
    Pakistan Petroleum Limited (PPL)
    Pakistan
    2018
  • Risk Based Inspection (RBI) Program Implementation
    BRUNEI METHANOL COMPANY (BMC)
    Brunei
    2018
  • SIL (Safety Integrity Level) Study for Three Boilers and Boiler House.
    GSK
    Pakistan
    2017
  • Supply of Software & Personnel for Material Tracking
    KJO (Al Khafji Joint Operations)
    Saudi Arabia
    2017
  • Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
    LukOil Middle East Ltd.
    Iraq
    2017
  • Pipeline Integrity Management Program
    Sui Northern Gas Pipeline Limited (SNGPL)
    Pakistan
    2017
  • Safety Integrity Level Assessment & Verification for Ammonia and LPG Circuits for Unilever ICF
    UNILEVER PAKISTAN LIMITED
    Pakistan
    2017
  • Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
    LukOil Middle East Ltd.
    Iraq
    2016
  • SIL Study for All Operating Units at QP Refinery , Mesa
    Qatar Petroleum
    Qatar
    2015
  • Risk Based Inspection Study (RBI) for Dolphin Energy Limited
    Dolphin Energy Limited,
    Qatar
    2015
  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS Floating LNG 1 (L) Ltd.
    Malaysia
    2015
  • Reliability Centered Maintenance (RCM) at Chemanol
    Chemanol
    Saudia Arabia
    2015
  • Development and Implementation of an integrated maintenance and reliability system (MRS) for Murphy’s operations
    Murphy
    Malaysia
    2014
  • Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
    Qatar Aluminium Ltd. (QATALUM)
    Qatar
    2014
  • Development, Implementation and Support of Pressurized Equipment Management System (PEMS) for Equipment and Piping System
    Bunduq Company Ltd
    United Arab Emirates UAE
    2014
  • Condition Assessment for Super Structure of LPG Tanks at Gas Operations, MESAIEED
    Salamander Energy
    Thailand
    2014
  • RBI study for Pipelines for GPD Gas Wells and Manifolds for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2013
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2013
  • Implementation of VAIL-Plant® Software and Provision of RBI Services for BW Offshore Singapore Ltd.
    BW Offshore
    Singapore
    2013
  • Small Bore Piping Integrity Program
    Egyptian ELNG
    Egypt
    2012
  • Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc.
    Newfield Peninsula
    Malaysia
    2012