Our Experience

  • Construction Environmental Management Plan (CEMP) , CEMP Quarterly Audit and ADCP for Design and Construction of Avenue Bridge Rb-01 and Rb-04
    AGILITY ENGINEERING & CONTRACTING COMPANY LLC
    UAE
    2024
  • Etudes Process Safety & HSE for Developpement des Champs Gaziers de TFT II, Extension du reseau de collecte TFT 11 – OFFSITE
    (GTP) Entreprise Nationale de Grands Travaux Pétroliers
    ALGERIA
    2024
  • PHSER-IV Study and Team Leader Services for Al Nouf Project
    NMDC
    UAE
    2024
  • Drops Survey for Rig ADES814 in Egypt
    ADES
    ALGERIA
    2024
  • CEMP ENVIRONMENTAL MONITORING AND REPORTING -2025
    Hyundai Samsung Joint Venture (HSJV)
    UAE
    2024
  • Firefighting and Safety Equipment Layout As a Part of Engineering Study Facilitators & Safety Consultancy Resources CTR-4
    Dubai Petroleum Establishment (DPE)
    UAE
    2024
  • Environmental Monitoring & Testing_2023
    CAPE EAST LIMITED, ABU DHABI (ALTRAD)
    UAE
    2024
  • HSE Studies for Emirates Sembcorp Water and Power Company PJSC – Fujairah
    EMIRATES SEMBCORP WATER & POWER COMPANY PJSC
    UAE
    2024
  • HSE Studies for EPC For Salt Domes Exploration (Leaching Facility) at Jebel DHANNA Area
    ARCHIRODON Construction Overseas Ltd
    UAE
    2024
  • HSE Studies for Habshan & Bab Telecom System Upgrade (HBTSU) Project
    Elsewedy Electric
    UAE
    2024
  • HSE Studies for Replacement of Black Start Engine CG – 6 & 7 at CFP
    Bilfinger Tebodin Middle East
    UAE
    2024
  • Third Party Chairman for Project Risk Management Review Workshop for ADNOC Onshore
    Engineering For The Petroleum and Process Industries (Enppi)
    UAE
    2024
  • Risk Protection Plan for PRS for CNG station at SHAJ
    Al Shabakah Tech. Cont
    UAE
    2024
  • Ref# 10004008-Stack Additional Monitoring_2024
    Arabian Gulf Steel Industries LLC (AGSI)
    UAE
    2024
  • HSE Studies for Feed/Detail Engineering for Fire Detection/Suppression System at SS7 & JFFCR and Pre-Feed for Fire Monitors at Berth 1, 2 & 3
    Bilfinger Tebodin Middle East
    UAE
    2024
  • Risk Assessment for construction activities
    C.A.T. International Limited – KSA Branch
    KSA
    2024
  • Noise Modelling Study for Replacement of Suction Scrubbers & Installation Suction Filters for Phase-I Lp/Mp Compressors (Al Nouf & Rumaitha). CTR-1
    Bilfinger Tebodin Middle East
    UAE
    2024
  • Etude HSE & PROCESS SAFETY Service d’ingénierie de 9 puits dans le cadre de la réalisation du projet infill drilling durant la phase d’exécution
    Entreprise Nationale de Grands Travaux Pétroliers (GTP)
    ALGERIA
    2024
  • Mangrove Management Plan | Mid Island Parkway – Phase 1C
    CHINA HARBOUR ENGINEERING COMPANY-LLC
    UAE
    2024
  • Safety Study For Mishrif Qurainat New Facility (MQNT) for the Rumaila Oil Field CTR-5 As a Part of SAFETY STUDIES OF FRAME CONTRACT FOR DESIGN PROJECTS (2023~2024)
    China Petroleum Engineering Co. Ltd.
    UAE
    2023
  • Environmental Monitoring-2023
    Dusit Thani Abu Dhabi
    UAE
    2023
SARA - Velosiaims Close Created by velosiaims.com.