Our Experience

  • Environmental Monitoring & Testing
    AL KHAYYAT INVESTMENTS (AKI)
    UAE
    2024
  • HSE Studies for E1690 for Detailed Engineering for Debottlenecking Of Water Injection Facilities at ZCC – Part-B
    Kent Group (Kent International Arabia, Abu Dhabi)
    UAE
    2024
  • Hydrodynamic Modelling and Brine Plume for the Project Carry Out Mixing Zone Study for the RO Plant Discharge
    NMDC GROUP
    UAE
    2024
  • HSE Study for Chemical Manufacturing and Trading Facility in Sharjah
    BEEAH
    UAE
    2024
  • HSE Studies for FEED for Replacement of Suction Scrubbers & Installation Suction Filters for Phase-I Lp/Mp Compressors (Al Nouf & Rumaitha).
    Bilfinger Tebodin Middle East
    UAE
    2024
  • CEMP ENVIRONMENTAL MONITORING AND REPORTING -2024
    Hyundai Samsung Joint Venture (HSJV)
    UAE
    2024
  • Comprehensive Risk Analysis Study for Removal & Disposal of Sludge and Overhauling of Crude Oil Tank T-290 & T-440.
    Dhafir Technologies LLC
    UAE
    2024
  • HSE Study for Chemical Manufacturing and Trading Facility in Sharjah
    BEEAH
    UAE
    2024
  • HSE Studies for “CED FWA T.22 – 11730: Fire Risk Assessment (FRA) Gap Study Recommendations in UAD
    Bilfinger Tebodin Middle East
    UAE
    2024
  • Environmental Monitoring & Testing_2023
    CAPE EAST LIMITED, ABU DHABI (ALTRAD)
    UAE
    2024
  • Drops Survey for Rig ADES814 in Egypt
    ADES
    ALGERIA
    2024
  • HSE Studies for Emirates Sembcorp Water and Power Company PJSC – Fujairah
    EMIRATES SEMBCORP WATER & POWER COMPANY PJSC
    UAE
    2024
  • HSEIA Studies for Design & Engineering Services for Zirku Airport Upgrade Variation No. 1
    Rafik El khoury & Partners
    UAE
    2024
  • Environmental Monitoring & Testing for AUH GCEM
    AUH GCEM (Gulf Cryo Company)
    UAE
    2024
  • HSE Studies for Habshan & Bab Telecom System Upgrade (HBTSU) Project
    Elsewedy Electric
    UAE
    2024
  • HSE Studies for Dalma (Arzana) Accommodations Project
    Amar Golden Design L.L.C
    UAE
    2024
  • Review and Optimize the Gas Detection System for Detailed Design Stage of SABIC Amiral Storage Project
    SINOPEC Nanjing Engineering Middle East Co., Ltd.
    KSA
    2024
  • Environmental Monitoring & Testing_2023
    CAPE EAST LIMITED, ABU DHABI (ALTRAD)
    UAE
    2024
  • Third Party HSE Studies for Project No. C5769 Real Time Operations Center And Remote CCR AT WTC – 6th Floor
    Kent International Arabia, Abu Dhabi
    UAE
    2024
  • HSE Studies for Long Term Accommodation Project (LTAP).
    VENUS INFRASTRUCTURE
    UAE
    2024
  • Ref# 10003516-Environmental Monitoring & Testing for Plot # 105HR9A-2024
    AGSI
    UAE
    2024
SARA - Velosiaims Close Created by velosiaims.com.