Our Experience

  • 4600006194 – Call-Off Contract for Supply of Services of Asset Integrity and Other Associated Services CTR-013Preparation of Weight Control Report & Global Inplace Analysis Report and Boat Impact Assessment for Bukha Alpha Platform
    OQ S.A.O.C.
    Oman
    2023
  • RAM Study including Asset Criticality Assessment
    Fluor Arabia Limited
    Saudi Arabia
    2023
  • Hazard Area Classification for Chemical Warehouse Facility inside JAFZA
    TRISTAR
    UAE
    2023
  • Construction Environmental Management Plan (CEMP) with CEMP Audits for Internal Roads and Infrastructure for the Newly Developed Lands in Al Shahama Area (223 Residential Plots)
    Combined Group Contracting Co.
    UAE
    2023
  • Re-performing ECA for TurkStream Gas Pipeline based on the Stress Analysis Report
    TürkAkım Gaz Taşıma AŞ
    Turkey
    2023
  • Construction Environmental Management Plan (CEMP) Review & Update of CEMP Report Rev 7
    Hyundai Samsung Joint Venture (HSJV)
    UAE
    2023
  • Call Out No. 20 for CALL-OFF ORDER FOR ASSIGNMENT OF ASSET INTEGRITY ADVISOR UNDER CONSULTANCY AND PROFESSIONAL SERVICES AGREEMENT FOR ASSET INTEGRITY CONSULTANCY STUDIES & TECHNICAL SUPPORT SERVICES ON CALL-OUT BASIS
    ADNOC
    UAE
    2023
  • ADNOC DRILLING RIG MOVE MANUAL
    ADNOC Drilling Company P.J.S.C.
    UAE
    2023
  • Prestation D’Elaboration des Etudes pour le projet CENTRE DE TRAITEMENT HASSI ILLATOU (CFC)
    SARPI
    ALGERIA
    2023
  • Preparation of Operation and Commissioning manual for AJAOKUTA KADUNA KANA Gas Pipeline Project
    Global Process Systems (GPS)
    UAE
    2023
  • HSE Studies for EPC for RSF (RIM Seal Fire) and FSF (Full Surface Fire) Fighting System Upgrade for COS Tanks at Zirku)
    Adyard Abu Dhabi LLC
    UAE
    2023
  • Environmental Monitoring & Testing
    ALAS EMIRATES READY MIX
    UAE
    2023
  • HSE Studies for Dalma (Arzana) Accommodations Project
    Amar Golden Design L.L.C
    UAE
    2023
  • 4600006194 – Call-Off Contract for Supply of Services of Asset Integrity and Other Associated Services CTR-010- HAZOP for WEST BUKHA PLATFORM as part of Call-Off Contract for Supply of Services of Asset Integrity and other Associated Services
    OQ S.A.O.C.
    Oman
    2023
  • Material Selection Study for Engineering Services for ADNOC ONSHORE TIE-INS
    Bilfinger Tebodin Middle East
    UAE
    2023
  • Environmental Monitoring & Testing
    NURAI ISLAND HOTEL
    UAE
    2023
  • Compensation Strategy for Area-2, Area-3 & Area-4
    National Marine Dredging Company (NMDC)
    UAE
    2023
  • HSE Studies for MOC 5910 and MOC 8208
    Avenir International Engineers & Consultants L.L.C
    UAE
    2023
  • 4600006194 – Call-Off Contract for Supply of Services of Asset Integrity and Other Associated Services CTR-014Lifting Study for Generator & Extension Platform (West Bukha
    OQ S.A.O.C.
    Oman
    2023
  • Reassessment of RBI for Onshore Pipeline (phase 1) as part of Asset Integrity Management System for TANAP Project CON-010
    TANAP Doğalgaz İletim A.Ş.
    Turkey
    2023
  • Fugitive Emission Study Services for ADNOC Onshore Project
    China Petroleum Pipeline Engineering Company Limited-Abu Dhabi
    UAE
    2023
SARA - Velosiaims Close Created by velosiaims.com.